East Central RailwayNot Started

Yard extension work e.g. Earthwork, blanketing, construction of minor bridges, retaining wall, platform, gate lodges, approach road, yard drain, wharfage and other misc. works including P.way works & ballast between Kaparpura-Jiwdhara section in connection with Muzaffarpur-Sagauli doubling project.

Estimate Cost

N/A

Sanctioned estimate

Tendered Cost

₹78.72 Cr

Awarded value

Physical Progress

0%

Work completed

Status

Not Started

Current stage

East Central Railway — CAO (Con)Not Started
Tendered₹78.72 Cr
Progress0%
Started20-02-2026
Target DOC19-07-2027
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)

Work Details

5 Fields
Work No.
93
Agency
Bateshwar Singh-Swata JV (Joint Venture) At Post Bihat
Tolakhemkaranpur, Dist-Begusarai, Bihar-851135
Acceptance / LOA
LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N=ETN-29-25-26/00868500149134 Dated 19.01.2026.
Officer in Charge
Indrajit Kumar, CE/C/NW/MHX; Avanish Sonu, Dy CE/C/I/HJP; Sri. Ravi Shankar Singh (AEN/Con/MFP-I)
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
N/A
Tendered Cost
₹78.72 Cr
Physical Progress
0%
Date Started
20-02-2026
Original DOC
19-07-2027
Extended DOC
N/A

Yard extension work e.g. Earthwork, blanketing, construction of minor bridges, retaining wall, platform, gate lodges, approach road, yard drain, wharfage and other misc. works including P.way works & ballast between Kaparpura-Jiwdhara section in connection with Muzaffarpur-Sagauli doubling project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Bateshwar Singh-Swata JV (Joint Venture) At Post Bihat. The tendered cost of the work is ₹78.72 Cr, and it is currently Not Started with physical progress recorded at 0%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work in progress.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Yard extension work e.g. Earthwork, blanketing, construction of minor bridges, r"?
Status: Not Started. This East Central Railway work is being executed by M/s Bateshwar Singh-Swata JV (Joint Venture) At Post Bihat. Physical progress stands at 0%. Current date of completion (DOC): 19-07-2027.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Bateshwar Singh-Swata JV (Joint Venture) At Post Bihat, Tolakhemkaranpur, Dist-Begusarai, Bihar-851135. Acceptance / agreement reference: LOA No. CAO-C-HQ-ENGINEERING/ECR-CAO-C-N=ETN-29-25-26/00868500149134 Dated 19.01.2026.. Work started on 20-02-2026.
QWhat is the cost of this railway work?
The tendered cost of "Yard extension work e.g. Earthwork, blanketing, construction" is ₹78.72 Cr. This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Yard extension work e.g. Earthwork, blanketing, construction" is one of hundreds of railway works covered.