Tender No. ECR-CAO-C-N-ETN-03-22-23 closing date 17-05-2022 for Balance work for Earth work filling in embankment, Supplying and providing of quarry dust/blanket material, construction of minor bridges, and other miscellaneous works between Bettiah (Excl.) CH:210.600 Km approx. to Chanpatia (Incl.) CH:226.60 Km approx. section in connection with doubling of Sagauli-Narkatiaganj section, under Dy.CE/Con/BTH.
Estimate Cost
₹27.52 Cr
Sanctioned estimate
Tendered Cost
₹29.42 Cr
+6.9% vs estimate
Physical Progress
100%
Work completed
Status
Final Bill / Closure
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsTender No. ECR-CAO-C-N-ETN-03-22-23 closing date 17-05-2022 for Balance work for Earth work filling in embankment, Supplying and providing of quarry dust/blanket material, construction of minor bridges, and other miscellaneous works between Bettiah (Excl.) CH:210.600 Km approx. to Chanpatia (Incl.) CH:226.60 Km approx. section in connection with doubling of Sagauli-Narkatiaganj section, under Dy.CE/Con/BTH. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Lord Vishnu Constructions Private Limited-Patna. The tendered cost of the work is ₹29.42 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
progress note: 100% (Work physically completed. Final bill under process.)
Frequently Asked Questions
- QWhat is the current status of the railway work "Tender No. ECR-CAO-C-N-ETN-03-22-23 closing date 17-05-2022 for Balance work for"?
- Status: Final Bill / Closure. This East Central Railway work is being executed by M/S Lord Vishnu Constructions Private Limited-Patna. Physical progress stands at 100%. Current date of completion (DOC): 30-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/S Lord Vishnu Constructions Private Limited-Patna, 102 A, Lotus Apartment, New Patliputra Colony, Patna-800013, Bihar, India. Acceptance / agreement reference: CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-03-22-23 / 01007930055076 Dated: 27/05/2022. Work started on 09-06-2022.
- QWhat is the cost of this railway work?
- The tendered cost of "Tender No. ECR-CAO-C-N-ETN-03-22-23 closing date 17-05-2022 " is ₹29.42 Cr (against an estimate of ₹27.52 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Tender No. ECR-CAO-C-N-ETN-03-22-23 closing date 17-05-2022 " is one of hundreds of railway works covered.