Left over P.Way work between SRGr-FBG section which included linking of track, supply, unloading, stacking & spreading of stone ballast on ready formation, transportation of P.way materials like rails, sleepers, fittings, etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge Conversion of Saharsa Forbesganj project.
Estimate Cost
₹21.87 Cr
Sanctioned estimate
Tendered Cost
₹17.67 Cr
-19.2% vs estimate
Physical Progress
98%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsLeft over P.Way work between SRGr-FBG section which included linking of track, supply, unloading, stacking & spreading of stone ballast on ready formation, transportation of P.way materials like rails, sleepers, fittings, etc. and other associated works as per Railway's specification and standard between Saraigarh (Ex.) to Forbesganj (Ex.) section in connection with Gauge Conversion of Saharsa Forbesganj project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Jyoti Construction and Engineering Pvt. Ltd.. The tendered cost of the work is ₹17.67 Cr, and it is currently Overdue with physical progress recorded at 98%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Left over P.Way work between SRGr-FBG section which included linking of track, s"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Jyoti Construction and Engineering Pvt. Ltd.. Physical progress stands at 98%. Current date of completion (DOC): 31-01-2024.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Jyoti Construction and Engineering Pvt Ltd.. Acceptance / agreement reference: ECR-CAO-C-N-ETN-16-21-22/10114650045093 dtd 18/11/2021; ECR/CAO/Con/WT/Agt/183 Dated 14/03/2022. Work started on 25-11-2021.
- QWhat is the cost of this railway work?
- The tendered cost of "Left over P.Way work between SRGr-FBG section which included" is ₹17.67 Cr (against an estimate of ₹21.87 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Left over P.Way work between SRGr-FBG section which included" is one of hundreds of railway works covered.