East Central RailwayFinal Bill / Closure

Construction of goods wharf with concrete flooring at Pratapganj station with approach road and other allied misc. work in connection with GC work between SRGR-FBG GC section.

Work #47
As of March 2026

Estimate Cost

₹5.39 Cr

Sanctioned estimate

Tendered Cost

₹4.23 Cr

-21.5% vs estimate

Physical Progress

100%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹4.23 Cr
Progress100%
Started20-08-2022
Target DOC12-07-2023
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG

Work Details

5 Fields
Work No.
47
Acceptance / LOA
ECR-CAO-C-N-ETN-07-22-23/00868500057802 Dtd 11/07/2022 ECR/CAO/Con/WT/Agt/211 Dtd 03.11.2022
Officer in Charge
Mahboob Alam CE/C/NC/MHX; Sri Pankaj Kumar Dy CE/C/III/SPJ; Sri A K Sinha AEN/C/DBG
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹5.39 Cr
Tendered Cost
₹4.23 Cr
Physical Progress
100%
Date Started
20-08-2022
Original DOC
12-07-2023
Extended DOC
N/A

Construction of goods wharf with concrete flooring at Pratapganj station with approach road and other allied misc. work in connection with GC work between SRGR-FBG GC section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Bateshwar Singh. The tendered cost of the work is ₹4.23 Cr, and it is currently Final Bill / Closure with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Work completed. Final variation & Final bill is under process.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of goods wharf with concrete flooring at Pratapganj station with ap"?
Status: Final Bill / Closure. This East Central Railway work is being executed by M/s Bateshwar Singh. Physical progress stands at 100%. Current date of completion (DOC): 12-07-2023.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Bateshwar Singh. Acceptance / agreement reference: ECR-CAO-C-N-ETN-07-22-23/00868500057802 Dtd 11/07/2022 ECR/CAO/Con/WT/Agt/211 Dtd 03.11.2022. Work started on 20-08-2022.
QWhat is the cost of this railway work?
The tendered cost of "Construction of goods wharf with concrete flooring at Pratap" is ₹4.23 Cr (against an estimate of ₹5.39 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of goods wharf with concrete flooring at Pratap" is one of hundreds of railway works covered.