East Central RailwayIn Progress

Construction of foundation and substructure of major bridges on well foundation and its allied work between Supaul-Pipra station in connection with Construction of new B.G. line between Supaul-Araria in Samastipur division of E.C. Railway.

Work #215
As of June 2026

Estimate Cost

₹64.95 Cr

Sanctioned estimate

Tendered Cost

₹67.89 Cr

+4.5% vs estimate

Physical Progress

91%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹67.89 Cr
Progress91%
Started15-12-2021
Target DOC31-03-2026
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG

Work Details

5 Fields
Work No.
215
Acceptance / LOA
ECR-CAO-C-N-ETN-39-20-21/00866770031271 Dtd 22/01/2021; ECR/CAO/Con/WT/Agt/162 Dated 12/04/2021
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; A K Sinha, AEN/C/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹64.95 Cr
Tendered Cost
₹67.89 Cr
Physical Progress
91%
Date Started
15-12-2021
Original DOC
31-03-2026
Extended DOC
N/A

Construction of foundation and substructure of major bridges on well foundation and its allied work between Supaul-Pipra station in connection with Construction of new B.G. line between Supaul-Araria in Samastipur division of E.C. Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Lall Construction Co.. The tendered cost of the work is ₹67.89 Cr, and it is currently In Progress with physical progress recorded at 91%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 67.89, 1st Suppl. Agt value-71.35

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of foundation and substructure of major bridges on well foundation "?
Status: In Progress. This East Central Railway work is being executed by M/s Lall Construction Co.. Physical progress stands at 91%. Current date of completion (DOC): 31-03-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Lall Construction Co.. Acceptance / agreement reference: ECR-CAO-C-N-ETN-39-20-21/00866770031271 Dtd 22/01/2021; ECR/CAO/Con/WT/Agt/162 Dated 12/04/2021. Work started on 15-12-2021.
QWhat is the cost of this railway work?
The tendered cost of "Construction of foundation and substructure of major bridges" is ₹67.89 Cr (against an estimate of ₹64.95 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation and substructure of major bridges" is one of hundreds of railway works covered.