East Central RailwayFinal Bill / Closure

Construction of foundation and sub-structure of major bridge No. 44 (pile foundation) at Km 43.727 between Saraiya-Parukhas, 211 (pile foundation) at Km 97.265, 220 (pile foundation) at Km 99.221, 228 (well foundation) at Km 102.565 between Kesaria-Bhupatpur in connection with construction of Hajipur-Sagauli New Rail Line Project.

Work #102
As of March 2026

Estimate Cost

₹25.78 Cr

Sanctioned estimate

Tendered Cost

₹23.22 Cr

-9.9% vs estimate

Physical Progress

79%

Work completed

Status

Final Bill / Closure

Current stage

East Central Railway — CAO (Con)Final Bill / Closure
Tendered₹23.22 Cr
Progress79%
Started18-10-2022
Target DOC20-04-2026
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP

Work Details

5 Fields
Work No.
102
Agency
Jai Mata Di Construction
Shri Krishna Puri South, Begusarai (Bihar)
Acceptance / LOA
CAO-C-HQ-Eng/ECR-CAO-C-N-ETN-31-22-23/01211020063918 dt 18.10.22
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
March 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹25.78 Cr
Tendered Cost
₹23.22 Cr
Physical Progress
79%
Date Started
18-10-2022
Original DOC
17-10-2023
Extended DOC
20-04-2026

Construction of foundation and sub-structure of major bridge No. 44 (pile foundation) at Km 43.727 between Saraiya-Parukhas, 211 (pile foundation) at Km 97.265, 220 (pile foundation) at Km 99.221, 228 (well foundation) at Km 102.565 between Kesaria-Bhupatpur in connection with construction of Hajipur-Sagauli New Rail Line Project. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Jai Mata Di Construction. The tendered cost of the work is ₹23.22 Cr, and it is currently Final Bill / Closure with physical progress recorded at 79%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

Final bill is under process

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of foundation and sub-structure of major bridge No. 44 (pile founda"?
Status: Final Bill / Closure. This East Central Railway work is being executed by M/s Jai Mata Di Construction. Physical progress stands at 79%. Current date of completion (DOC): 20-04-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Jai Mata Di Construction, Shri Krishna Puri South, Begusarai (Bihar). Acceptance / agreement reference: CAO-C-HQ-Eng/ECR-CAO-C-N-ETN-31-22-23/01211020063918 dt 18.10.22. Work started on 18-10-2022.
QWhat is the cost of this railway work?
The tendered cost of "Construction of foundation and sub-structure of major bridge" is ₹23.22 Cr (against an estimate of ₹25.78 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of foundation and sub-structure of major bridge" is one of hundreds of railway works covered.