Flash Butt Welding of 60Kg/52kg (R260/90/72 UTS) New/S.H rails/rail panels of all lengths using road-cum-rail mobile flash butt welding plant for various Construction/projects of East Central Railway under Chief Administrative Officer/Construction/North/East Central Railway
Estimate Cost
₹12.35 Cr
Sanctioned estimate
Tendered Cost
₹12.91 Cr
+4.5% vs estimate
Physical Progress
3%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsFlash Butt Welding of 60Kg/52kg (R260/90/72 UTS) New/S.H rails/rail panels of all lengths using road-cum-rail mobile flash butt welding plant for various Construction/projects of East Central Railway under Chief Administrative Officer/Construction/North/East Central Railway is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Synergy Rail Engineering Private Limited. The tendered cost of the work is ₹12.91 Cr, and it is currently In Progress with physical progress recorded at 3%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Flash Butt Welding of 60Kg/52kg (R260/90/72 UTS) New/S.H rails/rail panels of al"?
- Status: In Progress. This East Central Railway work is being executed by M/s Synergy Rail Engineering Private Limited. Physical progress stands at 3%. Current date of completion (DOC): 30-06-2027.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Synergy Rail Engineering Private Limited, Plot No 5-1-526, Office-5, 1st Floor, Sanmati Enclave, Jambagh, Hyderabad-500095. Acceptance / agreement reference: ECR-CAO-C-N-ETN-02-25-26/00924850132596 dated 30.06.2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Flash Butt Welding of 60Kg/52kg (R260/90/72 UTS) New/S.H rai" is ₹12.91 Cr (against an estimate of ₹12.35 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Flash Butt Welding of 60Kg/52kg (R260/90/72 UTS) New/S.H rai" is one of hundreds of railway works covered.