Erection, launching & transportation of girder on remaining Major bridges and other allied work, between Saraigarh to Forbesganj section in connection with GC work of Saharsa-Forbesganj station in Samastipur division of E.C. Railway.
Estimate Cost
₹3.11 Cr
Sanctioned estimate
Tendered Cost
₹3.05 Cr
-1.9% vs estimate
Physical Progress
53%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsErection, launching & transportation of girder on remaining Major bridges and other allied work, between Saraigarh to Forbesganj section in connection with GC work of Saharsa-Forbesganj station in Samastipur division of E.C. Railway. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s BRBA Infratech LLP. The tendered cost of the work is ₹3.05 Cr, and it is currently Overdue with physical progress recorded at 53%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Erection, launching & transportation of girder on remaining Major bridges and ot"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s BRBA Infratech LLP. Physical progress stands at 53%. Current date of completion (DOC): 31-01-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s BRBA Infratech LLP. Acceptance / agreement reference: ECR-CAO-C-N-ETN-05-23-24/10375900081520 Dtd 14.07.2023; ECR/ECRC/Civil/2023/0046 Dt 13.11.2023. Work started on 01-09-2023.
- QWhat is the cost of this railway work?
- The tendered cost of "Erection, launching & transportation of girder on remaining " is ₹3.05 Cr (against an estimate of ₹3.11 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Erection, launching & transportation of girder on remaining " is one of hundreds of railway works covered.