Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Pipra station (Excl.) to Triveniganj station (Incl.) i.e. Km 64.605 to Km 73.000 in connection with construction of new B.G. rail line between Araria-Supaul
Estimate Cost
₹7.20 Cr
Sanctioned estimate
Tendered Cost
₹7.96 Cr
+10.6% vs estimate
Physical Progress
100%
Work completed
Status
Completed
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsEarthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. works between Pipra station (Excl.) to Triveniganj station (Incl.) i.e. Km 64.605 to Km 73.000 in connection with construction of new B.G. rail line between Araria-Supaul is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Swata Construction. The tendered cost of the work is ₹7.96 Cr, and it is currently Completed with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and"?
- Status: Completed. This East Central Railway work is being executed by M/s Swata Construction. Physical progress stands at 100%. Current date of completion (DOC): 30-05-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Swata Construction, At PO Bihat, Tola Khemkaranpur, Begusarai-851135. Acceptance / agreement reference: ECR-CAO-C-N-ETN-13-23-24/00973860085374 Dated 25/08/2023; ECR/ECRC/Civil/2023/0052 Dt 13.11.2023. Work started on 25-09-2023.
- QWhat is the cost of this railway work?
- The tendered cost of "Earthwork in embankment, blanketing, construction of minor b" is ₹7.96 Cr (against an estimate of ₹7.20 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earthwork in embankment, blanketing, construction of minor b" is one of hundreds of railway works covered.