East Central RailwayCompleted

Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. work between Pipra station (Excl.) to Triveniganj station (Incl.) i.e. 64.605 to km 73.000 in connection with construction of new B.G. Rail line between Araria-Supaul.

Work #212
As of June 2026

Estimate Cost

₹85.10 Cr

Sanctioned estimate

Tendered Cost

₹75.01 Cr

-11.9% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹75.01 Cr
Progress100%
Started25-08-2023
Target DOC31-10-2025
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
212
Acceptance / LOA
ECR-CAO-C-N-ETN-36-21-22/10676480055005 Dtd 26/05/2022; ECR/CAO/Con/WT/Agt/201 Dtd 01.08.2022
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹85.10 Cr
Tendered Cost
₹75.01 Cr
Physical Progress
100%
Date Started
25-08-2023
Original DOC
31-10-2025
Extended DOC
N/A

Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and other allied misc. work between Pipra station (Excl.) to Triveniganj station (Incl.) i.e. 64.605 to km 73.000 in connection with construction of new B.G. Rail line between Araria-Supaul. is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Ram Niwas Singh Bateshwar Singh JV. The tendered cost of the work is ₹75.01 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 75.01 after 1st Suppl. Value 79.03

?

Frequently Asked Questions

QWhat is the current status of the railway work "Earthwork in embankment, blanketing, construction of minor bridges, RUB, LHS and"?
Status: Completed. This East Central Railway work is being executed by M/s Ram Niwas Singh Bateshwar Singh JV. Physical progress stands at 100%. Current date of completion (DOC): 31-10-2025.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s Ram Niwas Singh Bateshwar Singh JV. Acceptance / agreement reference: ECR-CAO-C-N-ETN-36-21-22/10676480055005 Dtd 26/05/2022; ECR/CAO/Con/WT/Agt/201 Dtd 01.08.2022. Work started on 25-08-2023.
QWhat is the cost of this railway work?
The tendered cost of "Earthwork in embankment, blanketing, construction of minor b" is ₹75.01 Cr (against an estimate of ₹85.10 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Earthwork in embankment, blanketing, construction of minor b" is one of hundreds of railway works covered.