Balance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major bridges with pile foundation, 3 Nos Major bridges as RCC box, 1 No major bridge substructure above well foundation and balance work on 47 no. minor bridges in between Saraigarh to Forbesganj in connection with Gauge conversion work from Saraigarh to Forbesganj
Estimate Cost
₹25.50 Cr
Sanctioned estimate
Tendered Cost
₹31.72 Cr
+24.4% vs estimate
Physical Progress
100%
Work completed
Status
Completed
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsBalance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major bridges with pile foundation, 3 Nos Major bridges as RCC box, 1 No major bridge substructure above well foundation and balance work on 47 no. minor bridges in between Saraigarh to Forbesganj in connection with Gauge conversion work from Saraigarh to Forbesganj is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s R.N. Jha. The tendered cost of the work is ₹31.72 Cr, and it is currently Completed with physical progress recorded at 100%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
tendered_cost_crore raw: 31.72 after 2nd Variation 23.95
Frequently Asked Questions
- QWhat is the current status of the railway work "Balance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major br"?
- Status: Completed. This East Central Railway work is being executed by M/s R.N. Jha. Physical progress stands at 100%. Current date of completion (DOC): 30-06-2022.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s R.N. Jha. Acceptance / agreement reference: ECR/CAO/Con/WT/E-Tender/North/42/16-17/3438 dt.17.07.2017; ECR/CAO/Con/WT/Agt/19 Dated 09.10.2017. Work started on 10-10-2017.
- QWhat is the cost of this railway work?
- The tendered cost of "Balance earth work in Saraigarh-Raghopur section, balance wo" is ₹31.72 Cr (against an estimate of ₹25.50 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Balance earth work in Saraigarh-Raghopur section, balance wo" is one of hundreds of railway works covered.