East Central RailwayCompleted

Balance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major bridges with pile foundation, 3 Nos Major bridges as RCC box, 1 No major bridge substructure above well foundation and balance work on 47 no. minor bridges in between Saraigarh to Forbesganj in connection with Gauge conversion work from Saraigarh to Forbesganj

Work #209
As of June 2026

Estimate Cost

₹25.50 Cr

Sanctioned estimate

Tendered Cost

₹31.72 Cr

+24.4% vs estimate

Physical Progress

100%

Work completed

Status

Completed

Current stage

East Central Railway — CAO (Con)Completed
Tendered₹31.72 Cr
Progress100%
Started10-10-2017
Target DOC30-06-2022
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR

Work Details

5 Fields
Work No.
209
Agency
Acceptance / LOA
ECR/CAO/Con/WT/E-Tender/North/42/16-17/3438 dt.17.07.2017; ECR/CAO/Con/WT/Agt/19 Dated 09.10.2017
Officer in Charge
Satya Prakash Yadav, CE/C/N/MHX; Pankaj Kr, Dy CE/C/III/SPJ; H R Chaudhary, AEN/C/SRGR
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹25.50 Cr
Tendered Cost
₹31.72 Cr
Physical Progress
100%
Date Started
10-10-2017
Original DOC
30-06-2022
Extended DOC
N/A

Balance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major bridges with pile foundation, 3 Nos Major bridges as RCC box, 1 No major bridge substructure above well foundation and balance work on 47 no. minor bridges in between Saraigarh to Forbesganj in connection with Gauge conversion work from Saraigarh to Forbesganj is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s R.N. Jha. The tendered cost of the work is ₹31.72 Cr, and it is currently Completed with physical progress recorded at 100%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

Remarks

tendered_cost_crore raw: 31.72 after 2nd Variation 23.95

?

Frequently Asked Questions

QWhat is the current status of the railway work "Balance earth work in Saraigarh-Raghopur section, balance work on 7 Nos major br"?
Status: Completed. This East Central Railway work is being executed by M/s R.N. Jha. Physical progress stands at 100%. Current date of completion (DOC): 30-06-2022.
QWho is the agency for this Bihar railway project?
The agency for this work is M/s R.N. Jha. Acceptance / agreement reference: ECR/CAO/Con/WT/E-Tender/North/42/16-17/3438 dt.17.07.2017; ECR/CAO/Con/WT/Agt/19 Dated 09.10.2017. Work started on 10-10-2017.
QWhat is the cost of this railway work?
The tendered cost of "Balance earth work in Saraigarh-Raghopur section, balance wo" is ₹31.72 Cr (against an estimate of ₹25.50 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Balance earth work in Saraigarh-Raghopur section, balance wo" is one of hundreds of railway works covered.