Assembling, Erection/Launching of superstructure of major bridge No. 44 (1X30.5m Composite Girder) at Km 43.727 between Saraiya-Parukhas, 211 (1X18.3m Composite Girder) at Km 97.265, 220 (1X24.4 m Composite Girder) at Km 99.221, 228 (1X45.7m OWG) at Km 102.565 between Kesaria-Bhopatpur in connection with construction of Hajipur-Sagauli new Rail line project
Estimate Cost
₹27.44 Cr
Sanctioned estimate
Tendered Cost
₹29.41 Cr
+7.2% vs estimate
Physical Progress
35%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsAssembling, Erection/Launching of superstructure of major bridge No. 44 (1X30.5m Composite Girder) at Km 43.727 between Saraiya-Parukhas, 211 (1X18.3m Composite Girder) at Km 97.265, 220 (1X24.4 m Composite Girder) at Km 99.221, 228 (1X45.7m OWG) at Km 102.565 between Kesaria-Bhopatpur in connection with construction of Hajipur-Sagauli new Rail line project is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s Ratan Kumar Dubey-Jalpaiguri. The tendered cost of the work is ₹29.41 Cr, and it is currently Overdue with physical progress recorded at 35%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Assembling, Erection/Launching of superstructure of major bridge No. 44 (1X30.5m"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/s Ratan Kumar Dubey-Jalpaiguri. Physical progress stands at 35%. Current date of completion (DOC): 10-08-2024.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s Ratan Kumar Dubey-Jalpaiguri, New Mal, Mal, Jalpaiguri-735221, West Bengal, India. Acceptance / agreement reference: Agt No. ECR/ECRC/Civil/2023/0054 dt 19.12.23; CAO-C-HQ-ENGINEERING / ECR-CAO-C-N-ETN-10-23-24 / 00851600084194 dt 10.08.23. Work started on 10-08-2023.
- QWhat is the cost of this railway work?
- The tendered cost of "Assembling, Erection/Launching of superstructure of major br" is ₹29.41 Cr (against an estimate of ₹27.44 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Assembling, Erection/Launching of superstructure of major br" is one of hundreds of railway works covered.