Maintenance & Repair Work of "Two Laning with Paved Shoulder of Chhapra Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to km 74+379 (Design Chainage), (Total Design length 73.079 Kms.) in the state of Bihar" on Performance-based Maintenance Contracts (PBMC)
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
N/A
Contract value
Length
73.079 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
5267
Aerial captures
Project Progress
Stage
Under O&M through OMT/TOT/O&M Agency at Site
Due Date
16-10-2029
Likely Date
-
Completion
0.0%
Physical Done
Project Timeline
Awarded
17-10-2024
Construction Started
17-10-2024
In Progress
Near Completion
-
Completed
-
Physical vs Financial Progress
Project Details
UPC
N/08034/01003/BR
National Highway
722
Regional Office
RO-Patna
State
Bihar
Mode
PBMC
Length
73.079 km
Contractor
Vinod Kumar Jain
Project Stage
Under O&M through OMT/TOT/O&M Agency at Site
Drone Frames
5267 frames
Last Flight
2026-01-27
Cost & Timeline
Awarded Cost
N/A
Capital Cost
N/A
Start Date
17-10-2024
PCOD Date
-
Scheduled Completion
16-10-2029
Likely Completion
-
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-06-19 17:00:58
Contractor Profile
Vinod Kumar Jain
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 73.079 km on 722, improving regional connectivity.
5267 drone frames uploaded — real-time aerial monitoring is active for this project.
Maintenance & Repair Work of "Two Laning with Paved Shoulder of Chhapra Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to km 74+379 (Design Chainage), (Total Design length 73.079 Kms.) in the state of Bihar" on Performance-based Maintenance Contracts (PBMC) is a National Highways Authority of India (NHAI) project on 722 in Bihar. is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Drone Imagery Available
5,267 frames · NHAI surveillance footage · UPC N/08034/01003/BR
Frequently Asked Questions
- What is the current status of the NHAI project "Maintenance & Repair Work of "Two Laning with Paved Shoulder of Chhapra Rewaghat"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under O&M through OMT/TOT/O&M Agency at Site. On schedule. Scheduled completion: 16-10-2029. Likely completion: -.
- Who is the contractor for this NHAI highway project?
- The contractor for Maintenance & Repair Work of "Two Laning with Paved Shoulder of Chhapra Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to km 74+379 (Design Chainage), (Total Design length 73.079 Kms.) in the state of Bihar" on Performance-based Maintenance Contracts (PBMC) is Vinod Kumar Jain. The project is under RO-Patna and covers 73.079 km on 722.
- What is the cost of this NHAI highway project?
- Project cost details are not available in our current drone-monitored data for this stretch.
- What is UPC N/08034/01003/BR in NHAI?
- UPC (Unique Project Code) N/08034/01003/BR refers to "Maintenance & Repair Work of "Two Laning with Paved Shoulder of Chhapra Rewaghat-Muzaffarpur section of NH-102 from Km 1+300 to Km 74+200 (Existing Chainage) and Km 1+300 to km 74+379 (Design Chainage), (Total Design length 73.079 Kms.) in the state of Bihar" on Performance-based Maintenance Contracts (PBMC)" — a National Highway project on 722 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.