Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of Silchar-Badarpur Churaibari section of NH-37 & NH-8 from Design chainage 38.600 End point of proposed Badarpur Bypass to Km. 62.800 Start point of proposed Nilambazar/Cheragi Bypass in the state of Assam on HAM Mode Package-4
Original Cost
₹1320 Cr
Baseline estimate
Revised Cost
₹1320 Cr
Latest approved cost
Expenditure
₹185 Cr
Spent to date
Utilization
14.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1135 Cr
Budget left
Budget Utilization
14.0%Spent
₹185 Cr
Remaining
₹1135 Cr
Total
₹1320 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/08/2027
Revised Completion
18/08/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1320 Cr — no cost escalation recorded.
Expenditure stands at ₹185 Cr, which is 14.0% of the revised project cost.
Remaining budget: ₹1135 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of Silchar-Badarpur Churaibari section of NH-37 & NH-8 from Design chainage 38.600 End point of proposed Badarpur Bypass to Km. 62.800 Start point of proposed Nilambazar/Cheragi Bypass in the state of Assam on HAM Mode Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1320.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of"?
- Widening/lmprovement to 4-Laning and Greenfield alignment with Paved shoulder of Silchar-Badarpur Churaibari section of NH-37 & NH-8 from Design chainage 38.600 End point of proposed Badarpur Bypass to Km. 62.800 Start point of proposed Nilambazar/Cheragi Bypass in the state of Assam on HAM Mode Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1320 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1320 Cr has not been significantly revised. Expenditure: ₹185 Cr (14.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/lmprovement to 4-Laning and Greenfield alignment wi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618309. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Laning and Greenfield alignment wi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.