Roads & HighwaysIPM · Central Project#618452

2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode under NHO-NE, stretch of IMBR

Ministry of Road Transport & HighwaysMizoram
Revised Cost: ₹782 CrUtilization: 6.2%

Original Cost

₹782 Cr

Baseline estimate

On budget

Revised Cost

₹782 Cr

Latest approved cost

Expenditure

₹48 Cr

Spent to date

Utilization

6.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹734 Cr

Budget left

Budget Utilization

6.2%
0%25%50%75%100%

Spent

₹48 Cr

Remaining

₹734 Cr

Total

₹782 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

06/12/2026

Revised Completion

31/12/2027

Completed

Project Details

Project Code618452
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-08

Financial Summary

Original Cost₹782 Cr
Revised Cost₹782 Cr
Expenditure₹48 Cr
Original End Date06/12/2026
Revised Date31/12/2027

Project Intelligence

Project is within original budget of ₹782 Cr — no cost escalation recorded.

Expenditure stands at ₹48 Cr, which is 6.2% of the revised project cost.

Remaining budget: ₹734 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode under NHO-NE, stretch of IMBR is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹782.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in"?
2-laning of Zorinpui - Longmasu section of NH-502A from km 0.000 to km 28.244 in the State of Mizoram on EPC mode under NHO-NE, stretch of IMBR is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹782 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹782 Cr has not been significantly revised. Expenditure: ₹48 Cr (6.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
2-laning of Zorinpui - Longmasu section of NH-502A from km 0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618452. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 2-laning of Zorinpui - Longmasu section of NH-502A from km 0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.