Roads & HighwaysIPM · Central Project#618312

Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenfield alignment form Design Ch. 62.800 start of proposed Nilambazar/Cheragi Bypass to Design Ch. 87.700 near Chandkhira Village of NH-8 on Silchar-Churaibari in the state of Assam on HAM Mode Package-5

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹1258 CrUtilization: 14.9%

Original Cost

₹1258 Cr

Baseline estimate

On budget

Revised Cost

₹1258 Cr

Latest approved cost

Expenditure

₹187 Cr

Spent to date

Utilization

14.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1071 Cr

Budget left

Budget Utilization

14.9%
0%25%50%75%100%

Spent

₹187 Cr

Remaining

₹1071 Cr

Total

₹1258 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/10/2027

Revised Completion

23/10/2027

Completed

Project Details

Project Code618312
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹1258 Cr
Revised Cost₹1258 Cr
Expenditure₹187 Cr
Original End Date23/10/2027
Revised Date23/10/2027

Project Intelligence

Project is within original budget of ₹1258 Cr — no cost escalation recorded.

Expenditure stands at ₹187 Cr, which is 14.9% of the revised project cost.

Remaining budget: ₹1071 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenfield alignment form Design Ch. 62.800 start of proposed Nilambazar/Cheragi Bypass to Design Ch. 87.700 near Chandkhira Village of NH-8 on Silchar-Churaibari in the state of Assam on HAM Mode Package-5 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1258.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenf"?
Widening/lmprovement to 4-Lane with Paved Shoulder from existing road and Greenfield alignment form Design Ch. 62.800 start of proposed Nilambazar/Cheragi Bypass to Design Ch. 87.700 near Chandkhira Village of NH-8 on Silchar-Churaibari in the state of Assam on HAM Mode Package-5 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1258 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1258 Cr has not been significantly revised. Expenditure: ₹187 Cr (14.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/lmprovement to 4-Lane with Paved Shoulder from exis is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618312. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Lane with Paved Shoulder from exis is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.