Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1
Original Cost
₹1081 Cr
Baseline estimate
Revised Cost
₹1081 Cr
Latest approved cost
Expenditure
₹163 Cr
Spent to date
Utilization
15.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹918 Cr
Budget left
Budget Utilization
15.1%Spent
₹163 Cr
Remaining
₹918 Cr
Total
₹1081 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/08/2027
Revised Completion
04/08/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1081 Cr — no cost escalation recorded.
Expenditure stands at ₹163 Cr, which is 15.1% of the revised project cost.
Remaining budget: ₹918 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1081.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633"?
- Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1081 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1081 Cr has not been significantly revised. Expenditure: ₹163 Cr (15.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618288. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.