Roads & HighwaysIPM · Central Project#618288

Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹1081 CrUtilization: 15.1%

Original Cost

₹1081 Cr

Baseline estimate

On budget

Revised Cost

₹1081 Cr

Latest approved cost

Expenditure

₹163 Cr

Spent to date

Utilization

15.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹918 Cr

Budget left

Budget Utilization

15.1%
0%25%50%75%100%

Spent

₹163 Cr

Remaining

₹918 Cr

Total

₹1081 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

04/08/2027

Revised Completion

04/08/2027

Completed

Project Details

Project Code618288
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹1081 Cr
Revised Cost₹1081 Cr
Expenditure₹163 Cr
Original End Date04/08/2027
Revised Date04/08/2027

Project Intelligence

Project is within original budget of ₹1081 Cr — no cost escalation recorded.

Expenditure stands at ₹163 Cr, which is 15.1% of the revised project cost.

Remaining budget: ₹918 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1081.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633"?
Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5.580 Km to Ch.25.633 Km Design Ch.0.000 Km to Ch.17.737km Km 901.100 to Km 921.145 of old NH-31 of Bilasipara- Guwahati road NH-17 Section Near Chirakuta to near Mowatari, before Chapar Bypass in the state ol Assam on HAM mode Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1081 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1081 Cr has not been significantly revised. Expenditure: ₹163 Cr (15.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618288. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Lane with Paved Shoulder from Ch.5 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.