Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6
Original Cost
₹870 Cr
Baseline estimate
Revised Cost
₹870 Cr
Latest approved cost
Expenditure
₹158 Cr
Spent to date
Utilization
18.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹712 Cr
Budget left
Budget Utilization
18.2%Spent
₹158 Cr
Remaining
₹712 Cr
Total
₹870 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/03/2027
Revised Completion
07/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹870 Cr — no cost escalation recorded.
Expenditure stands at ₹158 Cr, which is 18.2% of the revised project cost.
Remaining budget: ₹712 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹870.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Green"?
- Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹870 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹870 Cr has not been significantly revised. Expenditure: ₹158 Cr (18.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/lmprovement to 4-Lane with Paved shoulder for exist is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618311. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Lane with Paved shoulder for exist is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.