Roads & HighwaysIPM · Central Project#618311

Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹870 CrUtilization: 18.2%

Original Cost

₹870 Cr

Baseline estimate

On budget

Revised Cost

₹870 Cr

Latest approved cost

Expenditure

₹158 Cr

Spent to date

Utilization

18.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹712 Cr

Budget left

Budget Utilization

18.2%
0%25%50%75%100%

Spent

₹158 Cr

Remaining

₹712 Cr

Total

₹870 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

07/03/2027

Revised Completion

07/03/2027

Completed

Project Details

Project Code618311
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹870 Cr
Revised Cost₹870 Cr
Expenditure₹158 Cr
Original End Date07/03/2027
Revised Date07/03/2027

Project Intelligence

Project is within original budget of ₹870 Cr — no cost escalation recorded.

Expenditure stands at ₹158 Cr, which is 18.2% of the revised project cost.

Remaining budget: ₹712 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹870.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Green"?
Widening/lmprovement to 4-Lane with Paved shoulder for existing as well as Greenfield alignment of Badarpur Churaibari section of NH-8 from Design chainage 87.700 Chandkhira to Km. 106.500 Churaibari section Assam-Tripura border in the state of Assam on HAM Mode Package-6 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹870 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹870 Cr has not been significantly revised. Expenditure: ₹158 Cr (18.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/lmprovement to 4-Lane with Paved shoulder for exist is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618311. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/lmprovement to 4-Lane with Paved shoulder for exist is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.