Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3
Original Cost
₹459 Cr
Baseline estimate
Revised Cost
₹459 Cr
Latest approved cost
Expenditure
₹265 Cr
Spent to date
Utilization
57.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹194 Cr
Budget left
Budget Utilization
57.6%Spent
₹265 Cr
Remaining
₹194 Cr
Total
₹459 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/05/2025
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹459 Cr — no cost escalation recorded.
Expenditure stands at ₹265 Cr, which is 57.6% of the revised project cost.
Remaining budget: ₹194 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹459.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla G"?
- Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹459 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹459 Cr has not been significantly revised. Expenditure: ₹265 Cr (57.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/Improvement to 4-Lane with Paved Shoulder from km 6 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618340. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with Paved Shoulder from km 6 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.