Roads & HighwaysIPM · Central Project#618340

Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹459 CrUtilization: 57.6%

Original Cost

₹459 Cr

Baseline estimate

On budget

Revised Cost

₹459 Cr

Latest approved cost

Expenditure

₹265 Cr

Spent to date

Utilization

57.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹194 Cr

Budget left

Budget Utilization

57.6%
0%25%50%75%100%

Spent

₹265 Cr

Remaining

₹194 Cr

Total

₹459 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/05/2025

Revised Completion

31/10/2026

Completed

Project Details

Project Code618340
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹459 Cr
Revised Cost₹459 Cr
Expenditure₹265 Cr
Original End Date17/05/2025
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹459 Cr — no cost escalation recorded.

Expenditure stands at ₹265 Cr, which is 57.6% of the revised project cost.

Remaining budget: ₹194 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹459.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla G"?
Widening/Improvement to 4-Lane with Paved Shoulder from km 626030 Nalani hulla Gaon to km 650450 Chotahapjan on existing Tinsukhia -Makum Bypass of NH-15 OLD NH-37 and Strengthening of existing NH-315 OLD NH-38 from Km 0000 Chotahapjan to Km 16900 Bogapani section 2-Lane PS in Assam on EPCMode under NHO-NE Package-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹459 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹459 Cr has not been significantly revised. Expenditure: ₹265 Cr (57.6% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Improvement to 4-Lane with Paved Shoulder from km 6 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618340. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with Paved Shoulder from km 6 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.