Roads & HighwaysIPM · Central Project#618359

Widening/Improvement to 4-Lane with Paved Shoulder from km 55000 Nagabang Gamsuk to km 82514 Oyan in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km Package-3

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹665 CrUtilization: 57.3%

Original Cost

₹665 Cr

Baseline estimate

On budget

Revised Cost

₹665 Cr

Latest approved cost

Expenditure

₹381 Cr

Spent to date

Utilization

57.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹284 Cr

Budget left

Budget Utilization

57.3%
0%25%50%75%100%

Spent

₹381 Cr

Remaining

₹284 Cr

Total

₹665 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/03/2027

Revised Completion

17/03/2027

Completed

Project Details

Project Code618359
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹665 Cr
Revised Cost₹665 Cr
Expenditure₹381 Cr
Original End Date17/03/2027
Revised Date17/03/2027

Project Intelligence

Project is within original budget of ₹665 Cr — no cost escalation recorded.

Expenditure stands at ₹381 Cr, which is 57.3% of the revised project cost.

Remaining budget: ₹284 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Improvement to 4-Lane with Paved Shoulder from km 55000 Nagabang Gamsuk to km 82514 Oyan in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km Package-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹665.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Improvement to 4-Lane with Paved Shoulder from km 55000 Nagabang Gamsuk"?
Widening/Improvement to 4-Lane with Paved Shoulder from km 55000 Nagabang Gamsuk to km 82514 Oyan in the State of Assam and Arunachal Pradesh on EPC mode under Bharatmala Pariyojna of Length 27.514 Km Package-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹665 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹665 Cr has not been significantly revised. Expenditure: ₹381 Cr (57.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Improvement to 4-Lane with Paved Shoulder from km 5 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618359. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with Paved Shoulder from km 5 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.