Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2
Original Cost
₹1339 Cr
Baseline estimate
Revised Cost
₹1339 Cr
Latest approved cost
Expenditure
₹199 Cr
Spent to date
Utilization
14.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1140 Cr
Budget left
Budget Utilization
14.9%Spent
₹199 Cr
Remaining
₹1140 Cr
Total
₹1339 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/06/2027
Revised Completion
03/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1339 Cr — no cost escalation recorded.
Expenditure stands at ₹199 Cr, which is 14.9% of the revised project cost.
Remaining budget: ₹1140 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1339.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52."?
- Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1339 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1339 Cr has not been significantly revised. Expenditure: ₹199 Cr (14.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/Improvement to 4-Lane with paved Shoulder from Ch. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618287. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with paved Shoulder from Ch. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.