Roads & HighwaysIPM · Central Project#618287

Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2

Ministry of Road Transport & HighwaysAssam
Revised Cost: ₹1339 CrUtilization: 14.9%

Original Cost

₹1339 Cr

Baseline estimate

On budget

Revised Cost

₹1339 Cr

Latest approved cost

Expenditure

₹199 Cr

Spent to date

Utilization

14.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1140 Cr

Budget left

Budget Utilization

14.9%
0%25%50%75%100%

Spent

₹199 Cr

Remaining

₹1140 Cr

Total

₹1339 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

03/06/2027

Revised Completion

03/06/2027

Completed

Project Details

Project Code618287
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-08

Financial Summary

Original Cost₹1339 Cr
Revised Cost₹1339 Cr
Expenditure₹199 Cr
Original End Date03/06/2027
Revised Date03/06/2027

Project Intelligence

Project is within original budget of ₹1339 Cr — no cost escalation recorded.

Expenditure stands at ₹199 Cr, which is 14.9% of the revised project cost.

Remaining budget: ₹1140 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1339.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52."?
Widening/Improvement to 4-Lane with paved Shoulder from Ch. 25.633 Km to Ch. 52.470 Km Design Ch. 21.850 Km to Ch.48.670 Km for Package-2 of Bilasipura- Guwahati road NH-17 Section Near Mowatari, before Chapar Bypass to Tulungia junction with NH-17 in the state of Assam on HAM mode under NHO-NE Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹1339 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1339 Cr has not been significantly revised. Expenditure: ₹199 Cr (14.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Improvement to 4-Lane with paved Shoulder from Ch. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618287. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 4-Lane with paved Shoulder from Ch. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.