Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16900 Bogapani to km 27150 Golai Goan on existing Dibrugarh to Ledo section with proposed Digboi Bypass Green Field and Brownfield 2-LanePS of NH-315 OLD NH-38 in Tinsukia District under NHO- NE Package-4
Original Cost
₹357 Cr
Baseline estimate
Revised Cost
₹357 Cr
Latest approved cost
Expenditure
₹80 Cr
Spent to date
Utilization
22.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹277 Cr
Budget left
Budget Utilization
22.4%Spent
₹80 Cr
Remaining
₹277 Cr
Total
₹357 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/12/2025
Revised Completion
06/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹357 Cr — no cost escalation recorded.
Expenditure stands at ₹80 Cr, which is 22.4% of the revised project cost.
Remaining budget: ₹277 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16900 Bogapani to km 27150 Golai Goan on existing Dibrugarh to Ledo section with proposed Digboi Bypass Green Field and Brownfield 2-LanePS of NH-315 OLD NH-38 in Tinsukia District under NHO- NE Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹357.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16900 Bogapani t"?
- Widening/Improvement to 2-Lane Lane with Paved Shoulder from km 16900 Bogapani to km 27150 Golai Goan on existing Dibrugarh to Ledo section with proposed Digboi Bypass Green Field and Brownfield 2-LanePS of NH-315 OLD NH-38 in Tinsukia District under NHO- NE Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹357 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹357 Cr has not been significantly revised. Expenditure: ₹80 Cr (22.4% of cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Widening/Improvement to 2-Lane Lane with Paved Shoulder from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618339. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement to 2-Lane Lane with Paved Shoulder from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.