Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokpi to Sekmai section of Imphal-Kohima Road Design Ch. km 287.00 to 297.700 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5A
Original Cost
₹229 Cr
Baseline estimate
Revised Cost
₹229 Cr
Latest approved cost
Expenditure
₹143 Cr
Spent to date
Utilization
62.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹86 Cr
Budget left
Budget Utilization
62.6%Spent
₹143 Cr
Remaining
₹86 Cr
Total
₹229 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/08/2026
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹229 Cr — no cost escalation recorded.
Expenditure stands at ₹143 Cr, which is 62.6% of the revised project cost.
Remaining budget: ₹86 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokpi to Sekmai section of Imphal-Kohima Road Design Ch. km 287.00 to 297.700 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹229.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokp"?
- Widening/Improvement of existing 2-lane to 4-Lane Divided Highway from Kuraopokpi to Sekmai section of Imphal-Kohima Road Design Ch. km 287.00 to 297.700 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹229 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹229 Cr has not been significantly revised. Expenditure: ₹143 Cr (62.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/Improvement of existing 2-lane to 4-Lane Divided Hi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618301. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement of existing 2-lane to 4-Lane Divided Hi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.