Revised Cost: ₹212 CrUtilization: 128.4%

Original Cost

₹212 Cr

Baseline estimate

On budget

Revised Cost

₹212 Cr

Latest approved cost

Expenditure

₹272 Cr

Spent to date

Utilization

128.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹0 Cr

Budget left

Budget Utilization

128.4%
0%25%50%75%100%

Spent

₹272 Cr

Remaining

₹0 Cr

Total

₹212 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

21/01/2023

Revised Completion

30/09/2026

Completed

Project Details

Project Code618298
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹212 Cr
Revised Cost₹212 Cr
Expenditure₹272 Cr
Original End Date21/01/2023
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹212 Cr — no cost escalation recorded.

Expenditure stands at ₹272 Cr, which is 128.4% of the revised project cost.

Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road Design Chainage from Km 297700 to Km 308729 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹212.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekm"?
Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road Design Chainage from Km 297700 to Km 308729 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹212 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹212 Cr has not been significantly revised. Expenditure: ₹272 Cr (128.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening/Improvement of existing 2-Lane road to 4-Lane Divid is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618298. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement of existing 2-Lane road to 4-Lane Divid is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.