Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road Design Chainage from Km 297700 to Km 308729 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5B
Original Cost
₹212 Cr
Baseline estimate
Revised Cost
₹212 Cr
Latest approved cost
Expenditure
₹272 Cr
Spent to date
Utilization
128.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹0 Cr
Budget left
Budget Utilization
128.4%Spent
₹272 Cr
Remaining
₹0 Cr
Total
₹212 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
21/01/2023
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹212 Cr — no cost escalation recorded.
Expenditure stands at ₹272 Cr, which is 128.4% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road Design Chainage from Km 297700 to Km 308729 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹212.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekm"?
- Widening/Improvement of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilakuthi section of Imphal-Kohima Road Design Chainage from Km 297700 to Km 308729 of NH-39 New NH-02 in state of Manipur on EPC mode Pkg-5B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹212 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹212 Cr has not been significantly revised. Expenditure: ₹272 Cr (128.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening/Improvement of existing 2-Lane road to 4-Lane Divid is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618298. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening/Improvement of existing 2-Lane road to 4-Lane Divid is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.