Widening to two lane with paved shoulders from Km 0.00 to 102.310 Design Chainage of NH-548B Murrum-Maharashtra Border in the State of Karnataka
Original Cost
₹957 Cr
Baseline estimate
Revised Cost
₹957 Cr
Latest approved cost
Expenditure
₹400 Cr
Spent to date
Utilization
41.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹557 Cr
Budget left
Budget Utilization
41.8%Spent
₹400 Cr
Remaining
₹557 Cr
Total
₹957 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/01/2027
Revised Completion
15/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹957 Cr — no cost escalation recorded.
Expenditure stands at ₹400 Cr, which is 41.8% of the revised project cost.
Remaining budget: ₹557 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to two lane with paved shoulders from Km 0.00 to 102.310 Design Chainage of NH-548B Murrum-Maharashtra Border in the State of Karnataka is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹957.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to two lane with paved shoulders from Km 0.00 to 102.310 Design Chainag"?
- Widening to two lane with paved shoulders from Km 0.00 to 102.310 Design Chainage of NH-548B Murrum-Maharashtra Border in the State of Karnataka is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹957 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹957 Cr has not been significantly revised. Expenditure: ₹400 Cr (41.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to two lane with paved shoulders from Km 0.00 to 10 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618149. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to two lane with paved shoulders from Km 0.00 to 10 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.