Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalli ie., Design Ch. 485240 Km Existing Km 494.000 to Design Ch. 523393 Km Existing km 533.152 & From Design Ch. 530393 Existing Km 540.175 to Design Ch. 534476 Existing Km 544.200 at Nelligere of NH-150A on EPC mode under Annual Plan 2022-23 NH-150A-KNT-2022-23-977 dated 08.03.2023
Original Cost
₹617 Cr
Baseline estimate
Revised Cost
₹617 Cr
Latest approved cost
Expenditure
₹135 Cr
Spent to date
Utilization
21.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹482 Cr
Budget left
Budget Utilization
21.9%Spent
₹135 Cr
Remaining
₹482 Cr
Total
₹617 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
13/01/2027
Revised Completion
13/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹617 Cr — no cost escalation recorded.
Expenditure stands at ₹135 Cr, which is 21.9% of the revised project cost.
Remaining budget: ₹482 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalli ie., Design Ch. 485240 Km Existing Km 494.000 to Design Ch. 523393 Km Existing km 533.152 & From Design Ch. 530393 Existing Km 540.175 to Design Ch. 534476 Existing Km 544.200 at Nelligere of NH-150A on EPC mode under Annual Plan 2022-23 NH-150A-KNT-2022-23-977 dated 08.03.2023 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹617.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalli ie., D"?
- Widening to Two Lane with Paved Shoulders from KB Cross to Chunchanahalli ie., Design Ch. 485240 Km Existing Km 494.000 to Design Ch. 523393 Km Existing km 533.152 & From Design Ch. 530393 Existing Km 540.175 to Design Ch. 534476 Existing Km 544.200 at Nelligere of NH-150A on EPC mode under Annual Plan 2022-23 NH-150A-KNT-2022-23-977 dated 08.03.2023 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹617 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹617 Cr has not been significantly revised. Expenditure: ₹135 Cr (21.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to Two Lane with Paved Shoulders from KB Cross to C is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618086. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to Two Lane with Paved Shoulders from KB Cross to C is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.