Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh.
Original Cost
₹310 Cr
Baseline estimate
Revised Cost
₹310 Cr
Latest approved cost
Expenditure
₹63 Cr
Spent to date
Utilization
20.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹247 Cr
Budget left
Budget Utilization
20.3%Spent
₹63 Cr
Remaining
₹247 Cr
Total
₹310 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/11/2026
Revised Completion
10/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹310 Cr — no cost escalation recorded.
Expenditure stands at ₹63 Cr, which is 20.3% of the revised project cost.
Remaining budget: ₹247 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹310.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 o"?
- Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹310 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹310 Cr has not been significantly revised. Expenditure: ₹63 Cr (20.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to Four Lane rigid pavement configuration from Km 9 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617964. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to Four Lane rigid pavement configuration from Km 9 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.