Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh.

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹310 CrUtilization: 20.3%

Original Cost

₹310 Cr

Baseline estimate

On budget

Revised Cost

₹310 Cr

Latest approved cost

Expenditure

₹63 Cr

Spent to date

Utilization

20.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹247 Cr

Budget left

Budget Utilization

20.3%
0%25%50%75%100%

Spent

₹63 Cr

Remaining

₹247 Cr

Total

₹310 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

10/11/2026

Revised Completion

10/11/2026

Completed

Project Details

Project Code617964
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹310 Cr
Revised Cost₹310 Cr
Expenditure₹63 Cr
Original End Date10/11/2026
Revised Date10/11/2026

Project Intelligence

Project is within original budget of ₹310 Cr — no cost escalation recorded.

Expenditure stands at ₹63 Cr, which is 20.3% of the revised project cost.

Remaining budget: ₹247 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹310.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 o"?
Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 Km 42.0 to Km 53.300 as per new NH-330,design length of 11.300 km under EPC mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹310 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹310 Cr has not been significantly revised. Expenditure: ₹63 Cr (20.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to Four Lane rigid pavement configuration from Km 9 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617964. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to Four Lane rigid pavement configuration from Km 9 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.