Roads & HighwaysIPM · Central Project#618185

Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹395 CrUtilization: 9.4%

Original Cost

₹395 Cr

Baseline estimate

On budget

Revised Cost

₹395 Cr

Latest approved cost

Expenditure

₹37 Cr

Spent to date

Utilization

9.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹358 Cr

Budget left

Budget Utilization

9.4%
0%25%50%75%100%

Spent

₹37 Cr

Remaining

₹358 Cr

Total

₹395 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

07/08/2027

Revised Completion

06/08/2027

Completed

Project Details

Project Code618185
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹395 Cr
Revised Cost₹395 Cr
Expenditure₹37 Cr
Original End Date07/08/2027
Revised Date06/08/2027

Project Intelligence

Project is within original budget of ₹395 Cr — no cost escalation recorded.

Expenditure stands at ₹37 Cr, which is 9.4% of the revised project cost.

Remaining budget: ₹358 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹395.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c"?
Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹395 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹395 Cr has not been significantly revised. Expenditure: ₹37 Cr (9.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618185. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.