Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022
Original Cost
₹395 Cr
Baseline estimate
Revised Cost
₹395 Cr
Latest approved cost
Expenditure
₹37 Cr
Spent to date
Utilization
9.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹358 Cr
Budget left
Budget Utilization
9.4%Spent
₹37 Cr
Remaining
₹358 Cr
Total
₹395 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/08/2027
Revised Completion
06/08/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹395 Cr — no cost escalation recorded.
Expenditure stands at ₹37 Cr, which is 9.4% of the revised project cost.
Remaining budget: ₹358 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹395.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c"?
- Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 to 27.20 of NH-766c Byndoor-Ranebennur Section in the state of Karnataka on EPC Mode under Annual Plan 2022-23 NH-766C-KNT-2022-23-969 dated 30.12.2022 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹395 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹395 Cr has not been significantly revised. Expenditure: ₹37 Cr (9.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618185. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2LPS from Km 0.000 to 37.850 Except Ex. Km 24.45 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.