Widening to 2 Lanes with paved shoulders from Km.87/000 to 133/720 Nattukal to Thanau Jn. in Palakkad of NH-966 Old NH-213 on EPC mode Basis under NHO Annual Plan 2016-17 in the state of Kerala
Original Cost
₹294 Cr
Baseline estimate
Revised Cost
₹316 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
+7.4%
+₹22 Cr increase
Remaining
₹316 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹316 Cr
Total
₹316 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹294 Cr
Revised Cost
₹316 Cr
Increase
+₹22 Cr
Escalation
+7.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
22/08/2019
Revised Completion
30/06/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹22 Cr (7.4%) from the original estimate of ₹294 Cr.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹316 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 2 Lanes with paved shoulders from Km.87/000 to 133/720 Nattukal to Thanau Jn. in Palakkad of NH-966 Old NH-213 on EPC mode Basis under NHO Annual Plan 2016-17 in the state of Kerala is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹294.00 Cr, later revised to ₹315.63 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 2 Lanes with paved shoulders from Km.87/000 to 133/720 Nattukal to T"?
- Widening to 2 Lanes with paved shoulders from Km.87/000 to 133/720 Nattukal to Thanau Jn. in Palakkad of NH-966 Old NH-213 on EPC mode Basis under NHO Annual Plan 2016-17 in the state of Kerala is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Kerala. Original cost: ₹294 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹294 Cr and has been revised to ₹316 Cr — a cost overrun of +7.4%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening to 2 Lanes with paved shoulders from Km.87/000 to 1 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618070. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 Lanes with paved shoulders from Km.87/000 to 1 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.