Roads & HighwaysIPM · Central Project#618147

Widening to 2 Lane with Paved Shoulders from design Km 103.200 Existing Km 103.200 to design Km 116.700 Existing Km 118.470 on AP/KNT Border to Sira Section of NH-544E in the State of Karnatakaon EPC mode under Annual plan 2022-23

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹167 CrUtilization: 51.2%

Original Cost

₹167 Cr

Baseline estimate

On budget

Revised Cost

₹167 Cr

Latest approved cost

Expenditure

₹85 Cr

Spent to date

Utilization

51.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹82 Cr

Budget left

Budget Utilization

51.2%
0%25%50%75%100%

Spent

₹85 Cr

Remaining

₹82 Cr

Total

₹167 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/09/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618147
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹167 Cr
Revised Cost₹167 Cr
Expenditure₹85 Cr
Original End Date09/09/2025
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹167 Cr — no cost escalation recorded.

Expenditure stands at ₹85 Cr, which is 51.2% of the revised project cost.

Remaining budget: ₹82 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 2 Lane with Paved Shoulders from design Km 103.200 Existing Km 103.200 to design Km 116.700 Existing Km 118.470 on AP/KNT Border to Sira Section of NH-544E in the State of Karnatakaon EPC mode under Annual plan 2022-23 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹167.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 2 Lane with Paved Shoulders from design Km 103.200 Existing Km 103.2"?
Widening to 2 Lane with Paved Shoulders from design Km 103.200 Existing Km 103.200 to design Km 116.700 Existing Km 118.470 on AP/KNT Border to Sira Section of NH-544E in the State of Karnatakaon EPC mode under Annual plan 2022-23 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹167 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹167 Cr has not been significantly revised. Expenditure: ₹85 Cr (51.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 2 Lane with Paved Shoulders from design Km 103.2 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618147. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 Lane with Paved Shoulders from design Km 103.2 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.