Widening to 2 lane with paved shoulder from Km. 103.225 Pattadakal to Km. 133.00 Shirur cross of NH-367 in the state of Karnataka on EPC Mode.Job No. NH-367-KNT-2021-22-934
Original Cost
₹264 Cr
Baseline estimate
Revised Cost
₹264 Cr
Latest approved cost
Expenditure
₹4 Cr
Spent to date
Utilization
1.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹260 Cr
Budget left
Budget Utilization
1.4%Spent
₹4 Cr
Remaining
₹260 Cr
Total
₹264 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/05/2024
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹264 Cr — no cost escalation recorded.
Expenditure stands at ₹4 Cr, which is 1.4% of the revised project cost.
Remaining budget: ₹260 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening to 2 lane with paved shoulder from Km. 103.225 Pattadakal to Km. 133.00 Shirur cross of NH-367 in the state of Karnataka on EPC Mode.Job No. NH-367-KNT-2021-22-934 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹264.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening to 2 lane with paved shoulder from Km. 103.225 Pattadakal to Km. 133.00"?
- Widening to 2 lane with paved shoulder from Km. 103.225 Pattadakal to Km. 133.00 Shirur cross of NH-367 in the state of Karnataka on EPC Mode.Job No. NH-367-KNT-2021-22-934 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹264 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹264 Cr has not been significantly revised. Expenditure: ₹4 Cr (1.4% of cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Widening to 2 lane with paved shoulder from Km. 103.225 Patt is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618030. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2 lane with paved shoulder from Km. 103.225 Patt is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.