Roads & HighwaysIPM · Central Project#618084

Widening to 2-lane with paved shoulder from km 0.00 to 44.00 Kuru-Ghaghra section of NH-143A including re-construction of culverts and bridges.

Ministry of Road Transport & HighwaysJharkhand
Revised Cost: ₹134 CrUtilization: 80.8%

Original Cost

₹153 Cr

Baseline estimate

On budget

Revised Cost

₹134 Cr

Latest approved cost

Expenditure

₹108 Cr

Spent to date

Utilization

80.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹26 Cr

Budget left

Budget Utilization

80.8%
0%25%50%75%100%

Spent

₹108 Cr

Remaining

₹26 Cr

Total

₹134 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

08/08/2023

Revised Completion

31/10/2026

Completed

Project Details

Project Code618084
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJharkhand
Data Month2026-08

Financial Summary

Original Cost₹153 Cr
Revised Cost₹134 Cr
Expenditure₹108 Cr
Original End Date08/08/2023
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹153 Cr — no cost escalation recorded.

Expenditure stands at ₹108 Cr, which is 80.8% of the revised project cost.

Remaining budget: ₹26 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening to 2-lane with paved shoulder from km 0.00 to 44.00 Kuru-Ghaghra section of NH-143A including re-construction of culverts and bridges. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹153.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening to 2-lane with paved shoulder from km 0.00 to 44.00 Kuru-Ghaghra sectio"?
Widening to 2-lane with paved shoulder from km 0.00 to 44.00 Kuru-Ghaghra section of NH-143A including re-construction of culverts and bridges. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jharkhand. Original cost: ₹153 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹153 Cr and has been revised to ₹134 Cr — a cost overrun of -12.6%. Expenditure to date: ₹108 Cr (80.8% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening to 2-lane with paved shoulder from km 0.00 to 44.00 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618084. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening to 2-lane with paved shoulder from km 0.00 to 44.00 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.