Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dhaugaon- Podamari section of NH 326 in the State of Odisha under Annual Plan 2021.22.
Original Cost
₹187 Cr
Baseline estimate
Revised Cost
₹187 Cr
Latest approved cost
Expenditure
₹85 Cr
Spent to date
Utilization
45.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹102 Cr
Budget left
Budget Utilization
45.4%Spent
₹85 Cr
Remaining
₹102 Cr
Total
₹187 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/02/2026
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹187 Cr — no cost escalation recorded.
Expenditure stands at ₹85 Cr, which is 45.4% of the revised project cost.
Remaining budget: ₹102 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dhaugaon- Podamari section of NH 326 in the State of Odisha under Annual Plan 2021.22. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹187.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dhaugaon- Podamari sect"?
- Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dhaugaon- Podamari section of NH 326 in the State of Odisha under Annual Plan 2021.22. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹187 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹187 Cr has not been significantly revised. Expenditure: ₹85 Cr (45.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dha is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618012. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening & strengthenlng to 2LPS from km 0,000 to 40.000 Dha is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.