Widening & strengthening of existing carriageway in 2 lane with paved shoulders from km 25/0 to 59/2 design Ch km 25.467 to 59.200 of NH - 353C on EPC mode in the state of Telangana
Original Cost
₹206 Cr
Baseline estimate
Revised Cost
₹206 Cr
Latest approved cost
Expenditure
₹153 Cr
Spent to date
Utilization
74.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹53 Cr
Budget left
Budget Utilization
74.2%Spent
₹153 Cr
Remaining
₹53 Cr
Total
₹206 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/06/2020
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹206 Cr — no cost escalation recorded.
Expenditure stands at ₹153 Cr, which is 74.2% of the revised project cost.
Remaining budget: ₹53 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening & strengthening of existing carriageway in 2 lane with paved shoulders from km 25/0 to 59/2 design Ch km 25.467 to 59.200 of NH - 353C on EPC mode in the state of Telangana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹206.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening & strengthening of existing carriageway in 2 lane with paved shoulders "?
- Widening & strengthening of existing carriageway in 2 lane with paved shoulders from km 25/0 to 59/2 design Ch km 25.467 to 59.200 of NH - 353C on EPC mode in the state of Telangana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹206 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹206 Cr has not been significantly revised. Expenditure: ₹153 Cr (74.2% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Widening & strengthening of existing carriageway in 2 lane w is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618132. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening & strengthening of existing carriageway in 2 lane w is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.