Widening Strengthening of 2-Lane with Paved Shoulder from MyajlarJaisalmer from Design Chainage 0000 to 98350 Section of NH-11 & SundraMyajlarAmbasingh ki Dhani Road from Design Chainage 46000 to 81601, part of MunabaoTanot Road Section of NH-70 along with Strengthening/Widening of Existing Connection of NH-70 & NH-11 of length 0.914 km in the State of Rajasthan under NHO on Hybrid Annuity Mode
Original Cost
₹1238 Cr
Baseline estimate
Revised Cost
₹927 Cr
Latest approved cost
Expenditure
₹94 Cr
Spent to date
Utilization
10.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹833 Cr
Budget left
Budget Utilization
10.1%Spent
₹94 Cr
Remaining
₹833 Cr
Total
₹927 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/12/2027
Revised Completion
18/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1238 Cr — no cost escalation recorded.
Expenditure stands at ₹94 Cr, which is 10.1% of the revised project cost.
Remaining budget: ₹833 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening Strengthening of 2-Lane with Paved Shoulder from MyajlarJaisalmer from Design Chainage 0000 to 98350 Section of NH-11 & SundraMyajlarAmbasingh ki Dhani Road from Design Chainage 46000 to 81601, part of MunabaoTanot Road Section of NH-70 along with Strengthening/Widening of Existing Connection of NH-70 & NH-11 of length 0.914 km in the State of Rajasthan under NHO on Hybrid Annuity Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1238.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening Strengthening of 2-Lane with Paved Shoulder from MyajlarJaisalmer from "?
- Widening Strengthening of 2-Lane with Paved Shoulder from MyajlarJaisalmer from Design Chainage 0000 to 98350 Section of NH-11 & SundraMyajlarAmbasingh ki Dhani Road from Design Chainage 46000 to 81601, part of MunabaoTanot Road Section of NH-70 along with Strengthening/Widening of Existing Connection of NH-70 & NH-11 of length 0.914 km in the State of Rajasthan under NHO on Hybrid Annuity Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹1238 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1238 Cr and has been revised to ₹927 Cr — a cost overrun of -25.1%. Expenditure to date: ₹94 Cr (10.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening Strengthening of 2-Lane with Paved Shoulder from My is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618797. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening Strengthening of 2-Lane with Paved Shoulder from My is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.