Roads & HighwaysIPM · Central Project#618002

Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode

Ministry of Road Transport & HighwaysNagaland
Revised Cost: ₹193 CrUtilization: 51.6%

Original Cost

₹193 Cr

Baseline estimate

On budget

Revised Cost

₹193 Cr

Latest approved cost

Expenditure

₹100 Cr

Spent to date

Utilization

51.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹93 Cr

Budget left

Budget Utilization

51.6%
0%25%50%75%100%

Spent

₹100 Cr

Remaining

₹93 Cr

Total

₹193 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/06/2025

Revised Completion

Completed

Project Details

Project Code618002
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-05

Financial Summary

Original Cost₹193 Cr
Revised Cost₹193 Cr
Expenditure₹100 Cr
Original End Date18/06/2025
Revised DateN/A

Project Intelligence

Project is within original budget of ₹193 Cr — no cost escalation recorded.

Expenditure stands at ₹100 Cr, which is 51.6% of the revised project cost.

Remaining budget: ₹93 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹193.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening of existing single lane to intermediate lane road from Mokokchung to Ch"?
Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹193 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹193 Cr has not been significantly revised. Expenditure: ₹100 Cr (51.6% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Widening of existing single lane to intermediate lane road f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618002. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of existing single lane to intermediate lane road f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.