Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Widening of existing single lane to intermediate l
Roads & HighwaysIPM · Central Project#618002

Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode

Ministry of Road Transport & HighwaysNagalandData: 2026-05
Revised Cost: ₹193 CrUtilization: 51.6%

Original Cost

₹193 Cr

Baseline estimate

On Budget

Revised Cost

₹193 Cr

Latest approved cost

Expenditure

₹100 Cr

Spent to date

Utilization

51.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹93 Cr

Budget left

Budget Utilization

51.6%
0%25%50%75%100%

Spent

₹100 Cr

Remaining

₹93 Cr

Total

₹193 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/06/2025

Revised Completion

Completed

Project Details

Project Code618002
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-05

Financial & Timeline

Original Cost₹193 Cr
Revised Cost₹193 Cr
Expenditure₹100 Cr
Original End Date18/06/2025
Revised DateN/A

Project Intelligence

Project is within original budget of ₹193 Cr — no cost escalation recorded.

Expenditure stands at ₹100 Cr, which is 51.6% of the revised project cost.

Remaining budget: ₹93 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Frequently Asked Questions

What is IPM project "Widening of existing single lane to intermediate lane road from Mokokchung to Ch"?
Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹193 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹193 Cr has not been significantly revised. Expenditure: ₹100 Cr (51.6% of cost). Data as of 2026-05.
Which ministry is responsible for this project?
Widening of existing single lane to intermediate lane road f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618002. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of existing single lane to intermediate lane road f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview