Widening and Strengthening up gradation to 2 lane with paved shoulder from existing chainage Km 192.98 to Km 229.820 design chainage Km 162.800 to Km 198.18 under 31 BRTF on Akhnoor-Poonch Road NH-144A in the UT of Jammu and Kashmir under Project Sampark Border Roads Organisation BRO on EPC Mode Package-VIII Job No NH-144A-J&K-2022-2023-111
Original Cost
₹562 Cr
Baseline estimate
Revised Cost
₹562 Cr
Latest approved cost
Expenditure
₹159 Cr
Spent to date
Utilization
28.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹403 Cr
Budget left
Budget Utilization
28.2%Spent
₹159 Cr
Remaining
₹403 Cr
Total
₹562 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/01/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹562 Cr — no cost escalation recorded.
Expenditure stands at ₹159 Cr, which is 28.2% of the revised project cost.
Remaining budget: ₹403 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Strengthening up gradation to 2 lane with paved shoulder from existing chainage Km 192.98 to Km 229.820 design chainage Km 162.800 to Km 198.18 under 31 BRTF on Akhnoor-Poonch Road NH-144A in the UT of Jammu and Kashmir under Project Sampark Border Roads Organisation BRO on EPC Mode Package-VIII Job No NH-144A-J&K-2022-2023-111 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹562.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Strengthening up gradation to 2 lane with paved shoulder from exist"?
- Widening and Strengthening up gradation to 2 lane with paved shoulder from existing chainage Km 192.98 to Km 229.820 design chainage Km 162.800 to Km 198.18 under 31 BRTF on Akhnoor-Poonch Road NH-144A in the UT of Jammu and Kashmir under Project Sampark Border Roads Organisation BRO on EPC Mode Package-VIII Job No NH-144A-J&K-2022-2023-111 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹562 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹562 Cr has not been significantly revised. Expenditure: ₹159 Cr (28.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and Strengthening up gradation to 2 lane with paved is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618222. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Strengthening up gradation to 2 lane with paved is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.