Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35.800 Kuakhia - Mangalpur section of NH 20 in the state of Odisha on Annual Plan 2021-22
Original Cost
₹636 Cr
Baseline estimate
Revised Cost
₹636 Cr
Latest approved cost
Expenditure
₹447 Cr
Spent to date
Utilization
70.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹189 Cr
Budget left
Budget Utilization
70.2%Spent
₹447 Cr
Remaining
₹189 Cr
Total
₹636 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/02/2026
Revised Completion
30/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹636 Cr — no cost escalation recorded.
Expenditure stands at ₹447 Cr, which is 70.2% of the revised project cost.
Remaining budget: ₹189 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35.800 Kuakhia - Mangalpur section of NH 20 in the state of Odisha on Annual Plan 2021-22 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹636.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35.800 Kuakhia - Mangal"?
- Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35.800 Kuakhia - Mangalpur section of NH 20 in the state of Odisha on Annual Plan 2021-22 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹636 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹636 Cr has not been significantly revised. Expenditure: ₹447 Cr (70.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617899. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Strengthening to 4LPS/2LPS from km 0.000 to 35. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.