Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656
Original Cost
₹512 Cr
Baseline estimate
Revised Cost
₹512 Cr
Latest approved cost
Expenditure
₹50 Cr
Spent to date
Utilization
9.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹462 Cr
Budget left
Budget Utilization
9.8%Spent
₹50 Cr
Remaining
₹462 Cr
Total
₹512 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/06/2027
Revised Completion
02/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹512 Cr — no cost escalation recorded.
Expenditure stands at ₹50 Cr, which is 9.8% of the revised project cost.
Remaining budget: ₹462 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹512.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balik"?
- Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹512 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹512 Cr has not been significantly revised. Expenditure: ₹50 Cr (9.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and Strengthening to 2LPS including LA from km 318. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617920. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Strengthening to 2LPS including LA from km 318. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.