Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656

Ministry of Road Transport & HighwaysOdisha
Revised Cost: ₹512 CrUtilization: 9.8%

Original Cost

₹512 Cr

Baseline estimate

On budget

Revised Cost

₹512 Cr

Latest approved cost

Expenditure

₹50 Cr

Spent to date

Utilization

9.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹462 Cr

Budget left

Budget Utilization

9.8%
0%25%50%75%100%

Spent

₹50 Cr

Remaining

₹462 Cr

Total

₹512 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/06/2027

Revised Completion

02/06/2027

Completed

Project Details

Project Code617920
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateOdisha
Data Month2026-08

Financial Summary

Original Cost₹512 Cr
Revised Cost₹512 Cr
Expenditure₹50 Cr
Original End Date02/06/2027
Revised Date02/06/2027

Project Intelligence

Project is within original budget of ₹512 Cr — no cost escalation recorded.

Expenditure stands at ₹50 Cr, which is 9.8% of the revised project cost.

Remaining budget: ₹462 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹512.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balik"?
Widening and Strengthening to 2LPS including LA from km 318.970 to 353.450 Balikuda-Mulkani Section of NH-55 under NHO in Annual Plan 2022-23 in the State of Odisha. Job No. NH-55-OD-2022-23-656 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹512 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹512 Cr has not been significantly revised. Expenditure: ₹50 Cr (9.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening and Strengthening to 2LPS including LA from km 318. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617920. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Strengthening to 2LPS including LA from km 318. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.