Widening and Improvement of existing carriage way to 2 lane with paved shoulders from Km. 86/160 to 131/730 of Jangaon-Duddeda section of NH-365B in the State of Telangana on EPC Mode
Original Cost
₹423 Cr
Baseline estimate
Revised Cost
₹423 Cr
Latest approved cost
Expenditure
₹263 Cr
Spent to date
Utilization
62.1%
Of revised budget
Cost Status
+0.1%
+₹0 Cr increase
Remaining
₹161 Cr
Budget left
Budget Utilization
62.1%Spent
₹263 Cr
Remaining
₹161 Cr
Total
₹423 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹423 Cr
Revised Cost
₹423 Cr
Increase
+₹0 Cr
Escalation
+0.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/12/2024
Revised Completion
15/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹0 Cr (0.1%) from the original estimate of ₹423 Cr.
Expenditure stands at ₹263 Cr, which is 62.1% of the revised project cost.
Remaining budget: ₹161 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Widening and Improvement of existing carriage way to 2 lane with paved shoulders from Km. 86/160 to 131/730 of Jangaon-Duddeda section of NH-365B in the State of Telangana on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹423.00 Cr, later revised to ₹423.48 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening and Improvement of existing carriage way to 2 lane with paved shoulders"?
- Widening and Improvement of existing carriage way to 2 lane with paved shoulders from Km. 86/160 to 131/730 of Jangaon-Duddeda section of NH-365B in the State of Telangana on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹423 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹423 Cr and has been revised to ₹423 Cr — a cost overrun of +0.1%. Expenditure to date: ₹263 Cr (62.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening and Improvement of existing carriage way to 2 lane is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618141. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening and Improvement of existing carriage way to 2 lane is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.