Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode.
Original Cost
₹365 Cr
Baseline estimate
Revised Cost
₹365 Cr
Latest approved cost
Expenditure
₹304 Cr
Spent to date
Utilization
83.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹61 Cr
Budget left
Budget Utilization
83.3%Spent
₹304 Cr
Remaining
₹61 Cr
Total
₹365 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
19/05/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹365 Cr — no cost escalation recorded.
Expenditure stands at ₹304 Cr, which is 83.3% of the revised project cost.
Remaining budget: ₹61 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹365.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to "?
- Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹365 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹365 Cr has not been significantly revised. Expenditure: ₹304 Cr (83.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Upgradation & widening of Jharkheda- Berasia - Dholkhedi fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618019. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation & widening of Jharkheda- Berasia - Dholkhedi fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.