Roads & HighwaysIPM · Central Project#618019

Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode.

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹365 CrUtilization: 83.3%

Original Cost

₹365 Cr

Baseline estimate

On budget

Revised Cost

₹365 Cr

Latest approved cost

Expenditure

₹304 Cr

Spent to date

Utilization

83.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹61 Cr

Budget left

Budget Utilization

83.3%
0%25%50%75%100%

Spent

₹304 Cr

Remaining

₹61 Cr

Total

₹365 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

19/05/2025

Revised Completion

30/09/2026

Completed

Project Details

Project Code618019
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹365 Cr
Revised Cost₹365 Cr
Expenditure₹304 Cr
Original End Date19/05/2025
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹365 Cr — no cost escalation recorded.

Expenditure stands at ₹304 Cr, which is 83.3% of the revised project cost.

Remaining budget: ₹61 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹365.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to "?
Upgradation & widening of Jharkheda- Berasia - Dholkhedi from design km 0000 to km 87900 Design length 87.90km of NH-346 including 3 nos. bypasses of 13.10 Km in the State of Madhya Pradesh under EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹365 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹365 Cr has not been significantly revised. Expenditure: ₹304 Cr (83.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Upgradation & widening of Jharkheda- Berasia - Dholkhedi fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618019. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation & widening of Jharkheda- Berasia - Dholkhedi fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.