Upgradation to Two Lane with Paved Shoulders from Km 0.000 to Km 41.920 Green Field Alignment of Gowrelly to Valigonda Section of NH-930P in the State of Telangana on EPC Mode under Annual Plan 2022-23
Original Cost
₹690 Cr
Baseline estimate
Revised Cost
₹690 Cr
Latest approved cost
Expenditure
₹103 Cr
Spent to date
Utilization
14.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹587 Cr
Budget left
Budget Utilization
14.9%Spent
₹103 Cr
Remaining
₹587 Cr
Total
₹690 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/04/2028
Revised Completion
31/03/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹690 Cr — no cost escalation recorded.
Expenditure stands at ₹103 Cr, which is 14.9% of the revised project cost.
Remaining budget: ₹587 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Upgradation to Two Lane with Paved Shoulders from Km 0.000 to Km 41.920 Green Field Alignment of Gowrelly to Valigonda Section of NH-930P in the State of Telangana on EPC Mode under Annual Plan 2022-23 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹690.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Upgradation to Two Lane with Paved Shoulders from Km 0.000 to Km 41.920 Green Fi"?
- Upgradation to Two Lane with Paved Shoulders from Km 0.000 to Km 41.920 Green Field Alignment of Gowrelly to Valigonda Section of NH-930P in the State of Telangana on EPC Mode under Annual Plan 2022-23 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹690 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹690 Cr has not been significantly revised. Expenditure: ₹103 Cr (14.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Upgradation to Two Lane with Paved Shoulders from Km 0.000 t is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619009. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation to Two Lane with Paved Shoulders from Km 0.000 t is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.