Roads & HighwaysIPM · Central Project +26.6% overrun#618022

Upgradation to two lane with paved Shoulder Configuaration from Km. 0/00 to 47/000 of NH 351 Mahuva to Badhada section in the State of Gujarat

Ministry of Road Transport & HighwaysGujarat
Revised Cost: ₹219 CrUtilization: 57.3%Overrun: +₹46 Cr

Original Cost

₹173 Cr

Baseline estimate

+27% overrun

Revised Cost

₹219 Cr

Latest approved cost

Expenditure

₹126 Cr

Spent to date

Utilization

57.3%

Of revised budget

Escalated

Cost Status

+26.6%

+₹46 Cr increase

Remaining

₹94 Cr

Budget left

Budget Utilization

57.3%
0%25%50%75%100%

Spent

₹126 Cr

Remaining

₹94 Cr

Total

₹219 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹173 Cr

Revised Cost

₹219 Cr

Increase

+₹46 Cr

Escalation

+26.6%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

22/08/2025

Revised Completion

31/03/2027

Completed

Project Details

Project Code618022
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateGujarat
Data Month2026-08

Financial Summary

Original Cost₹173 Cr
Revised Cost₹219 Cr
Expenditure₹126 Cr
Original End Date22/08/2025
Revised Date31/03/2027

Project Intelligence

Cost has increased by ₹46 Cr (26.6%) from the original estimate of ₹173 Cr.

Expenditure stands at ₹126 Cr, which is 57.3% of the revised project cost.

Remaining budget: ₹94 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Upgradation to two lane with paved Shoulder Configuaration from Km. 0/00 to 47/000 of NH 351 Mahuva to Badhada section in the State of Gujarat is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹173.00 Cr, later revised to ₹219.08 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Upgradation to two lane with paved Shoulder Configuaration from Km. 0/00 to 47/"?
Upgradation to two lane with paved Shoulder Configuaration from Km. 0/00 to 47/000 of NH 351 Mahuva to Badhada section in the State of Gujarat is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹173 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹173 Cr and has been revised to ₹219 Cr — a cost overrun of +26.6%. Expenditure to date: ₹126 Cr (57.3% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Upgradation to two lane with paved Shoulder Configuaration is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618022. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation to two lane with paved Shoulder Configuaration is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.