Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar section from km 0/00 to 81/300 of NH 168G Mehsana to Idar in the State of GujaratTotal Length 81.300 Km on Hybrid Annuity Mode HAM
Original Cost
₹1155 Cr
Baseline estimate
Revised Cost
₹1155 Cr
Latest approved cost
Expenditure
₹142 Cr
Spent to date
Utilization
12.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1013 Cr
Budget left
Budget Utilization
12.3%Spent
₹142 Cr
Remaining
₹1013 Cr
Total
₹1155 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/06/2028
Revised Completion
19/06/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1155 Cr — no cost escalation recorded.
Expenditure stands at ₹142 Cr, which is 12.3% of the revised project cost.
Remaining budget: ₹1013 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar section from km 0/00 to 81/300 of NH 168G Mehsana to Idar in the State of GujaratTotal Length 81.300 Km on Hybrid Annuity Mode HAM is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1155.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar section from km 0/00 to 81"?
- Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar section from km 0/00 to 81/300 of NH 168G Mehsana to Idar in the State of GujaratTotal Length 81.300 Km on Hybrid Annuity Mode HAM is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹1155 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1155 Cr has not been significantly revised. Expenditure: ₹142 Cr (12.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar sectio is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618107. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation of Mehsana-Visnagar-vadnagar-Kheralu-Idar sectio is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.