Roads & HighwaysIPM · Central Project +3.8% overrun#617914

Upgradation and reconstruction of Shahpura-Dindori Section of NH 45 from Km 103.700 Design to Km 164.580 Design including 3 bypasses Total length 60.88km to Two lane with paved shoulder configuration along with One time improvement in 03 nos of bypassed built-up areas in a total length of 12.341 km in the State of Madhya Pradesh on EPC mode

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹250 CrUtilization: 51.9%Overrun: +₹9 Cr

Original Cost

₹241 Cr

Baseline estimate

+4% overrun

Revised Cost

₹250 Cr

Latest approved cost

Expenditure

₹130 Cr

Spent to date

Utilization

51.9%

Of revised budget

Escalated

Cost Status

+3.8%

+₹9 Cr increase

Remaining

₹120 Cr

Budget left

Budget Utilization

51.9%
0%25%50%75%100%

Spent

₹130 Cr

Remaining

₹120 Cr

Total

₹250 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹241 Cr

Revised Cost

₹250 Cr

Increase

+₹9 Cr

Escalation

+3.8%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

11/12/2025

Revised Completion

30/06/2027

Completed

Project Details

Project Code617914
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹241 Cr
Revised Cost₹250 Cr
Expenditure₹130 Cr
Original End Date11/12/2025
Revised Date30/06/2027

Project Intelligence

Cost has increased by ₹9 Cr (3.8%) from the original estimate of ₹241 Cr.

Expenditure stands at ₹130 Cr, which is 51.9% of the revised project cost.

Remaining budget: ₹120 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Upgradation and reconstruction of Shahpura-Dindori Section of NH 45 from Km 103.700 Design to Km 164.580 Design including 3 bypasses Total length 60.88km to Two lane with paved shoulder configuration along with One time improvement in 03 nos of bypassed built-up areas in a total length of 12.341 km in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹241.00 Cr, later revised to ₹250.09 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Upgradation and reconstruction of Shahpura-Dindori Section of NH 45 from Km 103."?
Upgradation and reconstruction of Shahpura-Dindori Section of NH 45 from Km 103.700 Design to Km 164.580 Design including 3 bypasses Total length 60.88km to Two lane with paved shoulder configuration along with One time improvement in 03 nos of bypassed built-up areas in a total length of 12.341 km in the State of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹241 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹241 Cr and has been revised to ₹250 Cr — a cost overrun of +3.8%. Expenditure to date: ₹130 Cr (51.9% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Upgradation and reconstruction of Shahpura-Dindori Section o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617914. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation and reconstruction of Shahpura-Dindori Section o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.