Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77100 Design to Km 170580 Design Total length 93.48km to Two lane with paved shoulder configuration along with One time improvement in 04 nos of bypassed built-up areas in a total length of 7.23 km in the state of Madhya Pradesh on EPC mode
Original Cost
₹492 Cr
Baseline estimate
Revised Cost
₹524 Cr
Latest approved cost
Expenditure
₹310 Cr
Spent to date
Utilization
59.2%
Of revised budget
Cost Status
+6.4%
+₹32 Cr increase
Remaining
₹214 Cr
Budget left
Budget Utilization
59.2%Spent
₹310 Cr
Remaining
₹214 Cr
Total
₹524 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹492 Cr
Revised Cost
₹524 Cr
Increase
+₹32 Cr
Escalation
+6.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/07/2026
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹32 Cr (6.4%) from the original estimate of ₹492 Cr.
Expenditure stands at ₹310 Cr, which is 59.2% of the revised project cost.
Remaining budget: ₹214 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77100 Design to Km 170580 Design Total length 93.48km to Two lane with paved shoulder configuration along with One time improvement in 04 nos of bypassed built-up areas in a total length of 7.23 km in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹492.00 Cr, later revised to ₹523.71 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 771"?
- Upgradation and reconstruction of Dindori - Mandla Section of NH 543 from Km 77100 Design to Km 170580 Design Total length 93.48km to Two lane with paved shoulder configuration along with One time improvement in 04 nos of bypassed built-up areas in a total length of 7.23 km in the state of Madhya Pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹492 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹492 Cr and has been revised to ₹524 Cr — a cost overrun of +6.4%. Expenditure to date: ₹310 Cr (59.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Upgradation and reconstruction of Dindori - Mandla Section o is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618043. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Upgradation and reconstruction of Dindori - Mandla Section o is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.