Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh.
Original Cost
₹322 Cr
Baseline estimate
Revised Cost
₹322 Cr
Latest approved cost
Expenditure
₹143 Cr
Spent to date
Utilization
44.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹179 Cr
Budget left
Budget Utilization
44.3%Spent
₹143 Cr
Remaining
₹179 Cr
Total
₹322 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
16/03/2027
Revised Completion
16/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹322 Cr — no cost escalation recorded.
Expenditure stands at ₹143 Cr, which is 44.3% of the revised project cost.
Remaining budget: ₹179 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹322.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Na"?
- Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Chhattisgarh. Original cost: ₹322 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹322 Cr has not been significantly revised. Expenditure: ₹143 Cr (44.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Up-gradation to Two/Four lane with paved shoulder Configurat is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617971. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to Two/Four lane with paved shoulder Configurat is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.