Roads & HighwaysIPM · Central Project#617971

Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh.

Ministry of Road Transport & HighwaysChhattisgarh
Revised Cost: ₹322 CrUtilization: 44.3%

Original Cost

₹322 Cr

Baseline estimate

On budget

Revised Cost

₹322 Cr

Latest approved cost

Expenditure

₹143 Cr

Spent to date

Utilization

44.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹179 Cr

Budget left

Budget Utilization

44.3%
0%25%50%75%100%

Spent

₹143 Cr

Remaining

₹179 Cr

Total

₹322 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/03/2027

Revised Completion

16/03/2027

Completed

Project Details

Project Code617971
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateChhattisgarh
Data Month2026-08

Financial Summary

Original Cost₹322 Cr
Revised Cost₹322 Cr
Expenditure₹143 Cr
Original End Date16/03/2027
Revised Date16/03/2027

Project Intelligence

Project is within original budget of ₹322 Cr — no cost escalation recorded.

Expenditure stands at ₹143 Cr, which is 44.3% of the revised project cost.

Remaining budget: ₹179 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹322.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Na"?
Up-gradation to Two/Four lane with paved shoulder Configuration of Kondagaon- Narayanpur from design ch. 0.00 - 48.693 Design Length 47.493 Km. 1.20 Km. retained on NH-130D under EPC mode in the State Chhattisgarh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Chhattisgarh. Original cost: ₹322 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹322 Cr has not been significantly revised. Expenditure: ₹143 Cr (44.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Up-gradation to Two/Four lane with paved shoulder Configurat is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617971. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to Two/Four lane with paved shoulder Configurat is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.