Roads & HighwaysIPM · Central Project#618398

Up-gradation to 2-lane with Paved Shoulder from Km 20.300 to Km 29.030 of 8.730 Km length on Goha-Khellani section on NH-244 in UT of Jammu and Kashmir on EPC Mode Package II

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹211 CrUtilization: 90.2%

Original Cost

₹211 Cr

Baseline estimate

On budget

Revised Cost

₹211 Cr

Latest approved cost

Expenditure

₹190 Cr

Spent to date

Utilization

90.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹21 Cr

Budget left

Budget Utilization

90.2%
0%25%50%75%100%

Spent

₹190 Cr

Remaining

₹21 Cr

Total

₹211 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

01/04/2022

Revised Completion

30/06/2026

Completed

Project Details

Project Code618398
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹211 Cr
Revised Cost₹211 Cr
Expenditure₹190 Cr
Original End Date01/04/2022
Revised Date30/06/2026

Project Intelligence

Project is within original budget of ₹211 Cr — no cost escalation recorded.

Expenditure stands at ₹190 Cr, which is 90.2% of the revised project cost.

Remaining budget: ₹21 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Up-gradation to 2-lane with Paved Shoulder from Km 20.300 to Km 29.030 of 8.730 Km length on Goha-Khellani section on NH-244 in UT of Jammu and Kashmir on EPC Mode Package II is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹211.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Up-gradation to 2-lane with Paved Shoulder from Km 20.300 to Km 29.030 of 8.730"?
Up-gradation to 2-lane with Paved Shoulder from Km 20.300 to Km 29.030 of 8.730 Km length on Goha-Khellani section on NH-244 in UT of Jammu and Kashmir on EPC Mode Package II is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹211 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹211 Cr has not been significantly revised. Expenditure: ₹190 Cr (90.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Up-gradation to 2-lane with Paved Shoulder from Km 20.300 t is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618398. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to 2-lane with Paved Shoulder from Km 20.300 t is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.