Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to Km20.300 of 7.450Km length on Goha-Khellani section and a link road to Goha village of 2.016 km on NH-244 in UT of Jammu and Kashmir on EPC Mode Pkg-1
Original Cost
₹228 Cr
Baseline estimate
Revised Cost
₹225 Cr
Latest approved cost
Expenditure
₹183 Cr
Spent to date
Utilization
81.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹42 Cr
Budget left
Budget Utilization
81.3%Spent
₹183 Cr
Remaining
₹42 Cr
Total
₹225 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/04/2022
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹228 Cr — no cost escalation recorded.
Expenditure stands at ₹183 Cr, which is 81.3% of the revised project cost.
Remaining budget: ₹42 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to Km20.300 of 7.450Km length on Goha-Khellani section and a link road to Goha village of 2.016 km on NH-244 in UT of Jammu and Kashmir on EPC Mode Pkg-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹228.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to Km20.300 of 7.450Km"?
- Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to Km20.300 of 7.450Km length on Goha-Khellani section and a link road to Goha village of 2.016 km on NH-244 in UT of Jammu and Kashmir on EPC Mode Pkg-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹228 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹228 Cr and has been revised to ₹225 Cr — a cost overrun of -1.2%. Expenditure to date: ₹183 Cr (81.3% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618394. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation to 2-lane with Paved Shoulder from Km 12.850 to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.