Up-gradation and strengthening to 2lanePS from Km 95/500 to km 129/775 of Nh 168G Idar-Bhiloda-Samlaji in the state of Gujarat Length 34.275 km
Original Cost
₹237 Cr
Baseline estimate
Revised Cost
₹237 Cr
Latest approved cost
Expenditure
₹181 Cr
Spent to date
Utilization
76.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹56 Cr
Budget left
Budget Utilization
76.3%Spent
₹181 Cr
Remaining
₹56 Cr
Total
₹237 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/12/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹237 Cr — no cost escalation recorded.
Expenditure stands at ₹181 Cr, which is 76.3% of the revised project cost.
Remaining budget: ₹56 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Up-gradation and strengthening to 2lanePS from Km 95/500 to km 129/775 of Nh 168G Idar-Bhiloda-Samlaji in the state of Gujarat Length 34.275 km is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹237.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Up-gradation and strengthening to 2lanePS from Km 95/500 to km 129/775 of Nh 168"?
- Up-gradation and strengthening to 2lanePS from Km 95/500 to km 129/775 of Nh 168G Idar-Bhiloda-Samlaji in the state of Gujarat Length 34.275 km is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹237 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹237 Cr has not been significantly revised. Expenditure: ₹181 Cr (76.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Up-gradation and strengthening to 2lanePS from Km 95/500 to is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618108. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Up-gradation and strengthening to 2lanePS from Km 95/500 to is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.